EDDIE UA frequently asked questions: lawful energy data, DataHub, federation and the European project
Зміст статті / On this page (22)
- Is EDDIE UA a new national DataHub?
- How is EDDIE UA related to European EDDIE?
- Why use the name EDDIE UA?
- Do customers already have data-access rights in Ukraine?
- Must the Electricity Market Law be rewritten?
- Does federation require several statutory metering administrators?
- What is EIC?
- Can I enter a company number and EIC to download readings?
- Is customer permission always the sole legal basis?
- Can permissions be revoked?
- Must access be free?
- Who can view my business's consumption history?
- Can earlier readings be corrected?
- Are inverter readings the same as official settlement data?
- Does EDDIE UA control batteries?
- Does access to my readings qualify an aggregator for balancing markets?
- Why not simply create one central API?
- What happens when the directory fails?
- Can I connect a real EIC to the public playground?
- Is EDDIE UA accredited?
- What is planned for 24 November 2026?
- How can I contribute?
Is EDDIE UA a new national DataHub?
No. EDDIE UA is an independent research initiative on interoperable, lawful and non-discriminatory access to information under Ukraine's existing statutory commercial metering framework. It is not the appointed national metering administrator.
How is EDDIE UA related to European EDDIE?
The original European Distributed Data Infrastructure for Energy was a Horizon Europe project that ended in June 2026, grant 101069510. Our name and research draw on its interoperability themes, but EDDIE UA is not its official Ukrainian branch, grant recipient, licensed franchise or endorsed partner. Read the full naming explanation.
Why use the name EDDIE UA?
It is an intellectual reference to European research on open, distributed energy data infrastructure; “UA” signals Ukraine's own jurisdiction and implementation questions. This does not confirm legal rights to any European project mark. Name/mark confusion still needs independent review.
Do customers already have data-access rights in Ukraine?
Ukrainian legislation contains relevant rights and procedures. Law 4834-IX in April 2026 strengthened the non-discriminatory access framework through the commercial metering administrator. The actual scope depends on applicable law and procedures; EDDIE UA does not create rights by itself.
Must the Electricity Market Law be rewritten?
Not necessarily. Some needs may be met by clarifying existing procedures, interfaces and conformance testing. Creating a separately authorised technical access role may require distinct legal analysis and possibly legislative changes.
Does federation require several statutory metering administrators?
No. Several information-service nodes are not several statutory AKOs. Our principal research design retains one legally authoritative metering/settlement framework. EU Regulation 2023/1162 does not prescribe multiple Ukrainian AKOs.
What is EIC?
An EIC is an identifier used for energy market objects in the relevant information exchange. It helps identify a metering point, but knowing an identifier is not proof of lawful entitlement, just as knowing a street address gives no right to private information.
Can I enter a company number and EIC to download readings?
Not automatically. The requester, relationship to the metering point, legal basis, purpose, recipient, date range and data scope all need appropriate verification.
Is customer permission always the sole legal basis?
No. Different activities may rely on distinct lawful bases, including obligations under law or contract. Software must distinguish them rather than treat every information exchange as a single consent switch.
Can permissions be revoked?
Where the relevant procedure allows, yes. Future access under a withdrawn permission and lawful retention of previously obtained records must be distinguished. The synthetic lab demonstrates a model, not a binding legal time limit.
Must access be free?
The actual charges and no-charge rights depend on applicable domestic law and procedures. EU principles are useful references but cannot simply be restated as a Ukrainian tariff.
Who can view my business's consumption history?
Only parties acting under the appropriate lawful basis and role. Open interoperability specifications do not mean public access to confidential industrial data. Developers should use synthetic records for testing.
Can earlier readings be corrected?
Commercial metering systems may apply established correction procedures. Versions, source, timestamps and correction lineage should be traceable. Silently overwriting a previous reading removes crucial evidence.
Are inverter readings the same as official settlement data?
Not automatically. Local BMS, inverter and EMS telemetry can be frequent and operationally useful but may be non-validated and have a different legal status from official commercial readings.
Does EDDIE UA control batteries?
No. EDDIE UA studies information access. Physical storage control requires separate hardware, grid/BMS protection, a local controller, customer authorisation and market/engineering procedures.
Does access to my readings qualify an aggregator for balancing markets?
No. Market registration, technical qualification, contracts, BRP arrangements and commitments are separate requirements. An information permission does not create them.
Why not simply create one central API?
That may be the best answer. A central open, geo-redundant API may cost less and be easier to operate. Federation should only be preferred when independent evidence demonstrates added legality-compatible value, security and cost-effectiveness.
What happens when the directory fails?
New actions without demonstrable entitlement should fail closed or enter a controlled pending state. Any caching, signed authorisation or offline mode must be designed and tested rather than assumed safe.
Can I connect a real EIC to the public playground?
No. The demonstrator uses fictional points and cannot lawfully verify real customer entitlement. Please do not submit confidential identifiers, contracts or consumption profiles to it.
Is EDDIE UA accredited?
No. Its G0–G4 admission sequence is a proposed research model, not a recognised legal accreditation framework. Passing GitHub tests does not grant market authority.
What is planned for 24 November 2026?
NCRECP agenda item 29 concerns approval of a draft Commercial Metering Code amendment. As of 21 November, that meeting is in the future. Results, final wording and entry-into-force status require checking afterward.
How can I contribute?
Read the project overview, European origins, practical scenarios and participation chapter. A formal feedback channel should only collect information after its lawful controller and privacy conditions are established.