EDDIE UA · an open research project · Ukraine
Energy data
has to
move.
- One official record.
- Interoperable access.
- Data only with consent.
We research how businesses, aggregators and consumers themselves can get lawful, secure and equal access to Ukraine’s energy data without duplicating the official settlement record.
A proposal, not a national system. Not affiliated with the EU-funded EDDIE project.
Your path to energy data
Choose your role for concrete steps. A public synthetic example is available without real EICs, contracts or requests to production DataHub.
Business
Metering history, your metering points, flexibility assessment
OpenAggregator
Lawful access without changing supplier or BRP
OpenDeveloper
JSON example, corrections, revocation and time intervals
OpenRegulator / administrator
Specific questions, testable procedures and sources
Open
Try the interactive access model – synthetic data only (UA interface)
WHERE THE IDEA CAME FROM
European EDDIE, Ukrainian questions.
Between 2023 and 2026 the Horizon Europe European Distributed Data Infrastructure for Energy project studied interoperable access to energy data across national systems. EDDIE UA intentionally references this research theme, but is a separate Ukrainian initiative, not an official branch or endorsed consortium partner.
European EDDIE and why we chose the nameData access equal for everyone
Consumption history, corrections and access grants matter to businesses and aggregators. We look for ways to remove needless integration barriers without creating a second settlement record.
- Rights
Rights and trust
Access only on a lawful basis, with verified representation and an entitlement to the specific metering point.
- Standard
Open rules
Equal terms for independent aggregators, suppliers and other eligible parties.
- Provenance
Data with a passport
Interval, quality, revision, source and correction history. Unknown never means zero.
One administrator, interoperable nodes
A federated layer of access services beside the existing settlement framework. An EIC directory finds the responsible node; permission, quality and provenance are checked separately.
- Request
- Consent
- Routing
- Data
Market participant
An aggregator, a supplier or the consumer
Permission service
Verifies rights to the metering point
EIC directory
Who is responsible for the metering point
Data node A / B
Versioned data, quality, correction log
Moving between technical nodes does not change the supplier, the BRP, the metering service provider or the administrator’s legal status.
- Taken from the grid
- Given to the grid
- No change
- No data
Each symbol carries its meaning without colour. An empty cell means «no data», never zero consumption.
The law exists
What is needed now is a verifiable procedure. Every row has a status and a source; a draft is never called law. As of 20.11.2026.
- Art. 53(6), Law No. 2019-VIII
- In force since 23.04.2026Law No. 4834-IX of 07.04.2026: non-discriminatory access of interested parties to consumer data through the administrator under the Metering Code. Source
- Art. 74, Law No. 2019-VIII
- In force since 23.04.2026As amended by Law No. 4834-IX: organisational and technical measures and monitoring of data access. Source
- Commercial Metering Code (No. 311)
- CurrentThe current metering rules; access procedures are still being specified. Source
- Metering Code amendments for No. 4834-IX
- DraftItem 29 on the NCRECP agenda for 24.11.2026. Not adopted yet. Source
- EU Regulation 2023/1162
- ReferenceEU procedures for access to metering data. Not binding in Ukraine and does not require several administrators. Source
- EDDIE UA architecture
- ProposalA federated layer of access services. Research, not an approved national infrastructure.
From framework to evidence
Five steps to an independent trial. The next one opens only when the one before has a verifiable result.
Law
Reconcile current law and the draft Metering Code amendments.
in progress
Contracts
Agree open interface contracts and access rules.
Ahead
Federation
Test a synthetic federation and its failures.
Ahead
Economics
Compare alternatives A / B / C.
Ahead
Pilot
Run an approved, lawful pilot.
Ahead
Materials for discussion
The regulator, the administrator, metering providers, BRPs, independent aggregators, consumers and engineers can challenge the proposal. Consultation is not open yet.
Regulatory proposals
Draft
OpenArchitecture RFC
Draft
OpenSynthetic playground
Synthetic data only
OpenPrimary sources
Laws, regulations, the Code
Open
Detailed research chapters are in the knowledge portal; full internal source documents remain private pending review and approval.
Join
the discussion.
Read the research, check the sources and show us where we are wrong. Every chapter keeps current law, drafts and proposals apart.

