# About EDDIE UA – trusted access to Ukraine's energy data

> Status: independent Wesfin Group research initiative. Proposed architecture, not an authorised national data system. Updated 20 November 2026.

## The central idea

A modern electricity customer may operate solar PV, battery storage, electric vehicles, chargers, heat pumps, refrigeration and flexible industrial loads. To use these resources effectively, knowing the address and the electricity bill is not enough. A customer or its authorised energy-service provider needs trustworthy interval readings, quality flags, correction history, a metering-point identifier and a legally established way of accessing defined data.

EDDIE UA examines how electricity data services could become interoperable and competitively neutral while keeping Ukraine's legally authoritative commercial metering and settlement functions with the competent organisations.

## The questions we are testing

Can an eligible independent aggregator with a valid legal basis obtain historical validated readings without bespoke, opaque integration? Can the customer see who received data and under which permission or other lawful basis? Can an external developer reproduce interoperability tests using synthetic data? Can the regulator compare access outcomes and timing across different types of eligible parties? Can a federated arrangement outperform a simpler central open API with geographic redundancy?

These are research questions, not established failings of the existing Ukrainian metering administrator. We do not allege a specific violation, assume that no access exists, or assert that federation necessarily lowers costs.

## Our six principles

- **Lawful entitlement:** EIC and company registration are identifiers, not proof that the requester may read a particular customer record.
- **One authoritative settlement framework:** a technical node cannot become a second statutory commercial metering administrator merely because the software can serve a reading.
- **Equal competitive access:** Wesfin Flex must receive no preferential interface, data or onboarding treatment relative to other eligible aggregators.
- **Fail closed:** uncertain permission means no new disclosure; missing meter readings do not equal zero consumption.
- **Inspectability:** decisions, source dates, document versions, API contracts and test outcomes must be attributable.
- **Architecture-neutral evaluation:** a centrally operated open interface is a legitimate comparator to federation.

## Who benefits from better procedures

Industrial and commercial customers want easier energy analysis and defensible control over data-sharing. Independent aggregators, suppliers and energy service companies want predictable onboarding and permission checks. Metering service providers, distribution operators, the statutory administrator and balance-responsible parties need clear division of duties. Software developers need testable contracts; regulators need transparent measures of equal treatment.

## What success would look like

A third party with no privileged relationship can pass a published onboarding process; a lawful request retrieves only its permitted data; a revoked grant is not silently reusable; corrections remain traceable; changes of technical service provider do not alter supplier or balance responsibility; and the economic value is evidenced through measured costs, not slogans.

## Identity and independence

EDDIE UA is an initiative of Wesfin Group. It is **not affiliated with or endorsed by** the separate EU-funded EDDIE research consortium, the European Commission, NCRECP or Ukrenergo. No organisation is a partner without confirmation. Independent name and mark clearance is still required prior to external promotion.


## What problem are we really trying to solve?

The electricity market is usually explained through prices, kilowatt-hours and megawatts. But every useful market or engineering decision also depends on information: which metering point the value belongs to, when the interval occurred, whether it has been validated, who may lawfully use it, which version is current and whether a correction was made later.

Consider two factories with the same monthly electricity bill. One consumes steadily while the other has short high peaks and most demand in expensive hours. They need different energy-management decisions, battery sizes and flexibility strategies. A monthly bill conceals the difference. Trusted interval data can reveal it – provided that the readings are reliable, legally accessible and assigned to the right metering point.

If every new energy service has to negotiate a bespoke interface for the same categories of information, integration costs may inhibit competition. Whether and to what extent this is occurring in Ukraine requires evidence, official responses and real user experiences. EDDIE UA does not present that hypothesis as an established violation by the incumbent data operator.

## One customer can choose many independent services

A commercial electricity customer may work simultaneously with its supplier, an energy auditor, a battery installer, a flexibility aggregator and a local automation provider. These parties do not all need the same data or have the same legal rights. The supplier has specific contractual functions. The auditor might need six months of historic intervals. The aggregator may need an appropriately defined dataset for its flexibility assessment. The local site controller can monitor physical devices without gaining statutory metering authority.

A credible access system must separate the purpose, recipient, legal basis, data categories, historical period, future access and auditable decision. Customers should be able to change service providers without silently changing their electricity supplier or balance responsible party.

This is why EDDIE UA should not become a proprietary customer database exclusively for Wesfin Flex. As a potential aggregator, Wesfin Flex must use the same published procedures as its competitors.

## A company number and EIC are not credentials

A company registration number identifies a legal entity. An EIC identifies an energy market object or metering point in the relevant context. Merely typing both into a form does not prove that the user represents the company or may retrieve a particular customer history.

Verification must establish lawful representation, the relevant relationship to the metering point at the requested time, the processing purpose, scope, recipient and duration. In production, such evidence must come from authorised procedures and sources. A research playground can simulate these checks but cannot issue real legal permissions.

## Why industrial and commercial customers are a useful starting point

Commercial premises, food processors, warehouses, factories, shopping centres and flexible industrial consumers often have immediate decisions that depend on interval data. They may need to size storage, evaluate self-consumption, schedule refrigeration, examine charging or demonstrate that a flexibility contract could be fulfilled.

A limited C&I research pilot makes it possible to study the paperwork, verification steps, integration hours, correction process and economic effect. Household participation poses additional privacy, support and scaling questions and should not be treated as already implemented merely because a prototype works for an invented industrial customer.

## Public standards do not mean public consumption profiles

An open architecture uses documented, interoperable rules. It does not require publishing every household's or factory's private electricity history on the internet. Market-level public datasets and sensitive individual metering records belong to different legal categories.

Similarly, lawful access for energy auditing does not automatically permit commercial profiling, advertising or onward sale. Permission and other lawful bases must be assessed against the intended processing activity and applicable data-protection rules.

## Why the European EDDIE story matters

The Horizon Europe project European Distributed Data Infrastructure for Energy ran between 2023 and 2026 and studied how energy services can work across fragmented national data environments. EDDIE UA references that research **as an intellectual inspiration for Ukraine**, not as an endorsed national branch, contractual partner or grant recipient.

Our [extensive article about European EDDIE and the naming choice](?page=european-eddie) explains its Framework, AIIDA, Marketplace and the distinctions between the two initiatives.

## A genuinely testable outcome

We need three categories of evidence. Legal evidence identifies the exact rule, competent institution and permitted data scope. Engineering evidence demonstrates independently reproducible access, refusal, revocation, corrections, provenance and incident handling. Economic evidence measures whether this approach improves access or cost relative to a central, open and resilient API.

If a central interface proves simpler and less expensive while meeting the same rights, adopting it may be the responsible choice. A research programme should be allowed to disprove its initial architectural hypothesis.


## Explore

- [Ukrainian law and proposals](?page=regulatory)
- [Technical architecture](?page=architecture)
- [White Paper and sources](?page=library)
- [Electricity Market Law](https://zakon.rada.gov.ua/laws/show/2019-19)
